INTILION | scalebloc at the Pader waste disposal company in Paderborn
Reference project

Reduce load peaks in waste disposal operations

High load peaks and additional costs due to service charges arise for the waste utilisation and disposal company in Paderborn as a result of the high start-up currents when the waste utilisers are switched on.

Project description

For the waste utilisation and disposal company in Paderborn, the high start-up currents when the waste utilisers are switched on cause high load peaks and additional costs due to the resulting service charges. To reduce the load peaks, PEG uses two INTILION | scaleblocs operated in combination. With the 1C variant, the load peaks can be reduced by up to 120 kW and the PEG saves significantly on the power price.

In the event of possible machine expansions or new investments by the waste disposal company, additional INTILION | scaleblocs can also be added to the system and thus ensure further savings.

INTILION quite simply got to the point of what we were looking for and implemented the solution exactly.

Location

Paderborn, Germany

Year of manufacture

2019

Sector

Waste and disposal

Use cases

Peak Shaving