Reduce load peaks in waste disposal operations
High load peaks and additional costs due to service charges arise for the waste utilisation and disposal company in Paderborn as a result of the high start-up currents when the waste utilisers are switched on.
Project description
For the waste utilisation and disposal company in Paderborn, the high start-up currents when the waste utilisers are switched on cause high load peaks and additional costs due to the resulting service charges. To reduce the load peaks, PEG uses two INTILION | scaleblocs operated in combination. With the 1C variant, the load peaks can be reduced by up to 120 kW and the PEG saves significantly on the power price.
In the event of possible machine expansions or new investments by the waste disposal company, additional INTILION | scaleblocs can also be added to the system and thus ensure further savings.
INTILION quite simply got to the point of what we were looking for and implemented the solution exactly.
Location
Paderborn, Germany
Year of manufacture
2019
Sector
Waste and disposal
Use cases
Peak Shaving