INTILION | scalebloc at the Pader waste disposal company in Paderborn

Reduce load peaks in waste disposal operations

Due to high starting currents when the waste recyclers are switched on, Pader Entsorgungs GmbH & Co.KG has high peak loads and the resulting costs. To reduce these costs, two INTILION | scaleblocs were installed as part of a development project.
Share:

Pader Entsorgungs GmbH & Co.KG​

Recycling and waste disposal company
Paderborn district (A.V.E. company-owned)

Contact person: Daniel Vermeulen
Industry: Waste Recycling
Date/Commissioning: 07.08.2019
Location: Paderborn,North Rhine-Westphalia

High load peaks and additional costs due to service charges arise for the waste disposal operation in Paderborn as a result of the high starting currents when the waste recyclers are switched on. To reduce the peak loads, PEG uses two INTILION | scaleblocs operated in combination. With the 1C variant the load peaks can be reduced by up to 120 kW and the PEG saves considerably on the performance price.
Even with possible machine extensions or new investments of the waste disposal company, further INTILION | scaleblocs can expand the system and thus provide further savings.

“Die INTILION hat einfach auf den Punkt gebracht, was wir uns vorgestellt haben und die Lösung sauber implementiert.”

Andreas Malinowski | Managing Director Pader Entsorgungs GmbH