
Research Project INZELL
Reference Project A 2.5 MW battery storage system from INTILION will enable the industrial cell at the Max Bögl company to be island-capable, which has
Commercial and industrial companies often have high peak loads in their energy consumption. An energy storage system can help shave those peaks.
Optimize energy consumption by storing surplus self-generated power for use when needed.
Ensure an independent power supply and prevent blackout by building an island grid with the help of an energy storage system.
The energy storage system charges up in times of low grid loads and provides power at peak times to relieve the grid load and ensure custom grid fees.
The grid is not designed to cope with the increasing number of electric vehicles charging points. Energy storage systems in-crease the available output and optimize the charging infrastructure.
An annual consumption of at least 10 GWh and 7,000 h qualifies you for individual and optimized grid fees. Energy storage systems can help.
Reference Project A 2.5 MW battery storage system from INTILION will enable the industrial cell at the Max Bögl company to be island-capable, which has
Reference project This is what the car dealership of the future looks like. Photovoltaics, energy storage and especially electromobility are becoming increasingly important. Autohaus Ehrhardt
Reference project Our large-scale storage system INTILION | scalecube is used to balance the load peaks of an industrial company in Germany and thus enables
Commercial storage system with medium storage capacities of approx. 70 kWh to 1,170 kWh
Scalable electricity storage system with storage capacities of approx. 150 kWh to 1,200 kWh
Designed especially for large and individual storage capacities of approx. 1 MWh to 100 MWh
NRW’s Minister for Economic Affairs and Climate Protection Mona Neubaur visits Paderborn-based energy storage provider INTILION The fact that a successful energy transition is only possible with energy storages has been made clear by the Paderborn-based provider INTILION during a
If distribution grid operators want to use energy storage, they are confronted with a rather intransparent regulatory situation. Therefore, we invited representatives of distribution grid operators from all over Germany to a round table on Wednesday. Demands on the Federal
Three of our scaleblocs are now turning Dortmund’s city center even more emission-free. The commercial storage units with a total capacity of 220 kilowatt hours are part of the new Smart Charging Hub charging park of Dortmunder Energie- und Wasserversorgung